Offer for Joint Venture Investment at Hazaribag,Dhaka, Bangladesh.


Offer for joint venture investment


Our company was decided to search a developer or partner for a project. Or sell a project
We have started a project on 26.5 katha land in Kalunagar mouja, Hazaribag Thana, Dhaka. From 2010.

·        At Hazaribag, kalunagar. 2, 50,000 sft Build able area for 3 basements and 16 levels high rise building
·        Developer- -Architecture research and development ltd.
·        Consultant-ARD- Architecture research and development
·        Investor –ARDL- Architecture research design and development ltd
·        Total area-1, 25,000-sft for developer 1, 25,000-sft for land owner
·        Land area -26.5 khata for apartment project.
·        Land owner developer ratio-50%/50%+2, 00, 00,000-signing money.
·        Deed done –March 2010
·        Future extention-100 khata over.
·        Cost of the total project
For 1st phase:For 26 khata land.
·        Total build able area110,000 sft
·        Total saleable area 55,000 sft
For 2nd phase: For 28.5khata land.
·        Total build able area115,000 sft
·        Total saleable area 55,500 sft
For 3rd phase: For 46.0khata land.
·        Total build able area165,600 sft
·        Total saleable area 82,800 sft
Present status of the project-
·        Agreement and land power for 1st phase for 26 khata land.
·         Already 1, 70, 74,800 tk. approximately done by ARDL in between- jannury 2010-to-jannury 2012.
·         RAJUK clearance on processing, it may be completed within 15th June 2012.
·         Sand filling done by local contractor-in 2010.
·         Soil test done by BUET in 2010.
·         Design done by BUET architects and engineers in 2010.
·         Attend fair on Sheraton hotel at Bangladesh in 2010.for promotion of the project.
·         Attend fair on DUBAI, SHARJAH, and ABU DHABHI in 2011.
·       Need investors or loan.
Specialty of this project: a project for 2030s concept
Green and integrated to nature, 50% solar and renewable energy, individual power house, water plant.
Sensor appliances for fixture, lighting and others to reduced energy consumption, digital technology.




Nit-profit out come from the project and Sale of the project-

For 1st phase for 26 khata land.

Cost is 2800 tk per sft.
Cost of the project is-                                         15, 40, 00,000tk.
Total marginal sale -                                           24, 75, 00,000tk
PROFT Against investment for three years-       9, 35, 00,000tk     
Total marginal sale rate-4500 tk per sft

For 2nd phase for 28.5khata land.
·        Total build able area115,000 sft
·        Total saleable area 55,500 sft
 
Cost is 2700 tk per sft.
Cost of the project is-                                         15, 40, 00,000tk.
Total marginal sale -                                            24, 75, 00,000tk
PROFT Against investment for three years-       9, 35, 00,000tk     
Total marginal sale rate-4800 tk per sft



Nit-profit- 7, 15, 00,000tk 125, 00, 00,000 tk. - 62, 12, 50,000=62, 87, 50,000 tk.
For 2nd phase: